As a leading global healthcare and diagnostics company, Hologic strives to make advances toward greater certainty for their customers by providing them with cutting-edge technology that makes a real difference. They move to narrow the gap between doubt and confidence and work to achieve both incremental and transformational progress to improve patients’ lives. LAB was […]
Engineering
Research and Development Headquarters
Moderna Therapeutics, a company pioneering the development of a new class of drugs made of messenger RNA (mRNA) has a clear mission to propel the field of mRNA science forward and deliver new medicines to patients. LAB was engaged to design their headquarters, manufacturing facilities and laboratories for partner companies at 320 Bent Street in […]
Research and Development Headquarters
As a leader in drug discovery for treatment of viral and infectious diseases with key focus on the hepatitis C virus (HCV), Idenix Pharmaceuticals engaged LAB to assist in site selection for their global R&D headquarters and to plan and design their new laboratories and office space. Working with TRG Builders as construction managers, we […]
Integrated Science Center
Designed as a concept study for a Boston-area college, the Integrated Science Center looks at fresh ways of designing teaching labs at the STEM level. The renovation brings together collaborative learning spaces with lab spaces and faculty areas, allowing for a seamless flow of learning. Computing lab areas act as hubs for the different disciplines […]
Research and Development Headquarters
50,000 square-foot programming and renovation study of the R&D headquarters for Covaris, a Boston-area technology company. Covaris provides tools and technologies to improve pre-analytical sample preparation, enable novel drug formulations, and manage compounds in the drug discovery process.
Technical and Administrative Center
Innovators of the electronic ink used in the Kindle, E Ink expanded their R&D capability with a move to Billerica MA and the creation of a new headquarters. Located in an existing 140,000sf shell/core office building, the project entailed the creation of high performance chemistry, physics, engineering, analytical and industrial process R&D labs. We teamed […]
Laboratory for Integrated Science and Engineering
A new construction project comprising 95,000 GSF with a construction cost of $32 Million. The program includes condensed matter Physics and Engineering, nano fabrication, material synthesis, characterization, microscopy and imaging. In addition, a floor of seminar space provides a central hub linked by bridge to other Physics and Engineering buildings. This project was completed while […]
Australian Institute of Nanoscience, School of Physics
LAB was engaged by the Department of Physics and the University to provide peer review services for a new nano science and fabrication building.
Bioengineering Center Renovation
LAB designed the renovations for the Bioengineering Institute in the Life Sciences Bioengineering Center at WPI’s Gateway Campus. The project includes wet and dry laboratories for biological research, Bio MEMS and advanced microscopy. By strategically placing an open lab and open office it became possible to eliminate hallways and to use the aisles within the […]





